Service manual
8. NETWORK SETTINGS
8.12 Service Manual CNS-9701
Connecting the Network System
Refer to the Network and System installation guide and Section 3 “Connecting the
Central Monitor to the Network System”.
Start the System
NOTE
Confirm that the “LINK” LED is lit on the hub and network connectors
for each instrument. If it is not lit when each instrument is turned on,
electrical connection is not complete. Confirm the wiring.
Turn on the power of the instruments in the following order.
1. UPS
2. These instruments can be turned on in any order.
• Central monitor main unit
• LCD unit
• Recorder unit
The following instruments can be turned on at any time.
• Laser printer
• Multiple patient receiver
• Bedside monitors and transmitters