Installation Manual
Table Of Contents
- Safe Installation, Use and Service
- APPROVALS
- General Safety Information
- Introduction
- Features And Components
- Installation Considerations
- Installation Requirements
- Gas Pressure Requirements
- Supply Gas Line
- Supply Gas Regulator
- Power Supply
- Mixing Valves
- Dishwashing Machines
- Closed Water Systems
- Thermal Expansion
- Temperature-Pressure Relief Valve
- Condensate Drain
- Combustible Material Storage
- Contaminated Air
- Air Requirements
- Unconfined Space
- Confined Space
- Fresh Air Openings For Confined Spaces
- Outdoor Air Through Two Openings
- Outdoor Air Through One Opening
- Outdoor Air Through Two Horizontal Ducts
- Outdoor Air Through Two Vertical Ducts
- Air From Other Indoor Spaces
- Installation Requirements - Commonwealth of Massachusetts
- Venting Installation
- General Venting Information
- General Venting Instructions
- Venting Requirements
- Venting Installation Sequence
- Power Vent Installation
- Direct Vent Installation
- Vertical Termination Installation
- Sidewall Termination Installation
- Polypropylene Installations
- AL29-4C Vent Installations
- Concentric Termination Installation
- 6 Inch Concentric Termination Installation
- Low Profile Vent Installation
- Water Heater Installation
- Temperature Regulation
- Control System Operation
- Start Up
- Troubleshooting
- Maintenance
- Diagrams
- Notes
- Limited Warranty
32
This water heater is certied for sidewall direct venting
with IPEX System 636 Low Prole Vent Kit. Follow
instructions below for proper installations.
All termination kits must be located and installed in
accordance with local building code and CSA B149.1
Natural Gas and Propane Installation Code.
1. Once the proper location has been determined, cut
2 holes in the wall large enough to accommodate
the pipe. Pipe diameters and distance between hole
centers can be found in Table 12.
2. Slide both the intake and exhaust pipes through the
holes. Solvent cement both pipes to the base of the
vent termination kit, follow the solvent cementing
procedures outlined in the IPEX System 636
Installation Guide, which is available on the web
www.ipexinc.com.
3. To fasten the Base to the wall, use the supplied
screws and anchors. A 3/16” (5mm) hole, 1-3/16”
(30mm) deep, will need to be drilled for the anchors.
Locate the anchor hole using the base as a template.
4. Screw the Cap to the Base using the supplied screws.
5. Once the vent termination and pipes are secured,
the wall penetrations will need to be sealed from the
interior using a PVC-compatible sealant material.
6. All vent pipes and air inlets must terminate at the
same height to avoid possibility of severe personal
injury, death, or substantial property damage.
7. Operate heater through 1 heat cycle to ensure
combustion-air and vent pipes are properly connected
to concentric vent termination
TABLE 12
Low Prole Termination Kits - Dimensions
AOS Kit Number IPEX Part Number Description
Pipe Outside
Diameter
Hole Spacing
(Center to Center)
9008934005 196986 4" Flush Mount Vent Kit 4.50" 5.63"
9008935005 196080 6" Flush Mount Vent Kit 6.61" 7.63"
Each Kit Contains
Qty Item Description
1 Base (two holes)
1 Cap (one hole)
8 Stainless Steel Screws
4 Plastic Anchors
LOW PROFILE VENT INSTALLATION