Full Product Manual
6
Need help? For technical support call 305-614-4070 or visit us at www.ANZZI.com
Installation Steps
Step 1
Pass the long screw (3) through the wall mounting bracket (1)
Step 2
The wall mounting bracket (1) is fixed on the vertical rod through the long screw (3),
and it is noted that the side holes are facing downward toward the floor,
Fix the remaining 3 wall mounting brackets according to this method.
Step 3
Measure the distance of the center hole of the four wall mounting brackets
installed with a tape measure to obtain the four dimensions of
AB,AC,CD and BD.
Step 4
According to the measured dimensions, mark the positions of four points A,B,C and D.
It is recommended to install it at a position above 600mm from the ground.
Pay attention to ensure that AB and CD connections need to be horizontal
and AC and BD connections need to be vertical.
Place the towel rack at the marked position to confirm the levelness and verticality again.
Step 5
Drill holes at positions A,B,C and D with a size of φ0.135x1.77” (φ8x45mm).
Knock the screw expansion sleeve(5) into the wall with a hammer.
Step 6
Fix the fixing block (6) with the self-tapping
A B
C
D
X 600mm
A
B
C
D








