Installation Guide

Prepare for wall mounting.
INSTALLATION
PERFECTION IS OUR TRADITION™
pg. 4
Step 4
Attach the remaining three brackets (1) to the vertical bars
by repeating steps 1, 2, and 3..
Step 5
Using the measuring tape & level, measure and mark the four anchor
locations. You will need to measure from A to B, A to C, D to D, and
finally B to D. It’s recommended to install the towel warmer a minimum
of 24” (2’) from the floor.
Step 6
Once all the anchor points are marked on
the wall (A, B, C, & D). Confirm the towel
warmer brackets will align correctly with
the markings.
B
C
D
24”