Installation Guide

8
4. Level the tray and place marks on the studs above the upper
edge of the tile flange.
See Fig. 5 for details.
5. Mix the bedding material (Mortar, cement-sand mix,etc.)Concrete
or plaster is not recommended.
Apply enough bedding material to support the entire bottom of
the shower base.This will add additional stability and prevent the
base from shifting position.
See Fig. 6 f
or details.
Fig. 5
Fig. 6
Level base in two directions
Mortar