Full Product Manual
8
Have questions? Call us at
FIGURE 6
or visit us at www.ANZZI.com
B) OVERFLOW PLATE INSTALLATION
Not e: The tub is pre-built with internal overflow .
Installation st eps:
1. Insert the met al bar [Part 1] int o the overflow hole. See Figures 1 and 2.
2. Thread the screw through the metal bar and the overflow plat e behind it . Tight en the screw.
See Figures 3 and 4.
3. Inst all the overflow cover onto the bar and lock it in. See Figures 5 and 6.
FIGURE 1 FIGURE 2
FIGURE 3
FIGURE 4
FIGURE 5










