Full Product Manual

Have questions? Call us at or visit us at www.ANZZI.com
D) POSITION THE TUB
Before placing the tub, make sure the ground is completely flat. Next, place the tub over
the intended installat ion area. Lastly, insert the drain through the drain hole in the floor.
See the Figure below.
11
* All bathtubs are 100% water tested at the factory and certified to be free of leaks.
Transportation and mishandling may cause leaks. It is necessary to test the
bathtub while there is access to all sides of the bathtub.