Full Product Manual
PG. 4
STEP 6:
Position the Faucet [05] over the intended
installation spot. Mark the center point on
the floor. Then, mark the Anchor [21] screw
holes on the floor.
a.
b.
c.
Drill a 2” [51mm] hole into the floor, see Fig. 7.
Drill three 25/64” [10mm] holes into the concrete
floor. If floor is composed of wood, then there is no
need for drilling.
Connect the Inlet Hoses [23] to the water supply
lines (which should be protruding from the ground
and have matching male threading).
STEP 7:
Note: Make sure to connect the Inlet Hose [23] labeled
on “Hot” to the hot water supply line and t
he
Inlet Hose
[23] labeled “Cold” to the cold water supply line.
STEP 5:
Install the Faucet [05] to the Post [16].
Align the Faucet [05] with the Post [16]
and tighten the Screw [06] to secure.
.
.
INSTALLATION
5
[06]
6
7
2"
[51mm]
hole
marks of Anchor [21]
screw holes on the floor
mark of Anchor [21]
center point on
the floor
25/64"
[10mm]
hole
Supply Lines with
3/8 compression
male thread
Inlet
Hose