Full Product Manual
INSTALLATION
STEP 1:
Slide the Escutcheon [20] onto the Post [16].
Note: The unthreaded point of the Post [16]
pointed upward.
STEP 3:
Slide the Inlet Hose [23] through the Post [16]
from the bottom of the Anchor [21].
STEP 2:
Install the Anchor [21] to the Post [16] and
secure.
STEP 4:
Install the Inlet Hoses [23] to the Faucet [05]
and secure.
Note: Makes sure to connect the Inlet Hose [23]
labeled “Hot” to the Faucet [05] inlet marked
“H” and the Inlet Hose [23] labeled “Cold” to
the Faucet [05] inlet marked “C”.
no thread
[16]
[16]
[20] [21]
1 2
[23]
[23]
[21]
3 4
PG.3