User Manual

Antaira Technologies - Industrial Ethernet Switches
LNX-2602G-SFP Series User Manual V1.0
8
2. Push down the metal clasp and pull the transceiver out by the plastic part as shown below in
Figure 2.9.
2.7 Wiring the Power Inputs
Please follow the steps below to insert the power wire.
1. Insert the AC power cable into the universal AC socket as shown below in Figure 2.10.
2. To turn the power on, push the power switch.
Figure 2.10 AC Power Socket
Figure 2.9 - Pull Out from the SFP Module