Specifications

6
7
3.Use the 3-wired power cable (the wires with cross-sectional area of 1.5mm
2
) to connect the power.
Pull the power cable through a cable holder (3) and connect it into the connection terminals (2) as follows:
Possible pin identication schemes:
Cable (EU) Cable (US) Pin International
Brown Black Live L
Liht blue White Neutral N
Yellow/
Green
Green Earth
Connect the earth-wire (10) with the earth-terminal (9) on the ceiling box (8).
If you have any doubts about proper installation,consult a qualied electrician!
Make sure the wires are securely connected.Tighten 2 screws in the cable holder to secure the power cable in it.
For protection from electric shock,the xture must be grounded!
4.Connect the data cables to the xture DMX input/output.
5.Fasten 2 covers on the ceiling box by 14 screws.
DANGER TO LIFE!
For protection from dangerous electric shock,the xture must be
installed in ceiling box and covered with box covers before applying power!
Before taking into operation for the rst time,the installation has to be
approved by an expert!
When installing xtures side-by-side,
avoid illuminating one xture with another!
4.2 Fitting the frost ltr
The ArcWash Recessed 136 RGB is supplied with clear front glass (factory tted) and two types of frost lters (lms). If
you wish to use a diffusive light ,follow the steps to install desired frost lter:
1
2
2.Put the frost lm on the front glass and centre the holes
in the lm on the holes in the holder of the glass.
3.Put the ring carefully back and tighten both fastening
screws.
1.Remove the ring (1) from the forefront
of the head by loosening both fastening
screws (2).
3