Specifications
6
7
4. Installation
4.1 Mounting the xture
The moving head is designed for ceiling mounting.
The installation is of the projector has to be built and constructed in a way that it can hold 10 times the weight for 1 hour
without any harming deformation.
When rigging, derigging or servicing the xture staying in the area below the installation place, under high working places
and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an expert before
taking into operation for the rst time and after changes before taking into operation another time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an expert after
every four year in the course of an acceptance test.
The operator has to make sure that safety relating and machine-technical installations are approved by a skilled person
once a year.
The moving head should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including calculating working load limits,
installation material being used, and periodic safety inspection of all installation material and the projector. If you lack these
qualications, do not attempt the installation yourself.Improper installation can result in bodily injury and (or) damage to
property.
The moving head should be installed out of the reach of people.
Danger of re !
When installing the device, make sure there is no highly inammable
material (decoration articles, etc.) in between a distance of min. 0.5 m.
CAUTION!
Make sure that the device is xed properly! Ensure that the structure (truss)
to which you are attaching the xtures is secure.
The ArcWash Recessed 136 RGB includes a moving head and a ceiling box for mounting to the lower ceiling.
Installation:
1.Fix the recessed ceiling box (8) to the lower ceiling.Be careful the mounting grid can hold the moving head installati-
on!
The ceiling box must be xed properly ,otherwise the vibration of the mounting structure can occur during the operation of
the moving head. Pull the power cable (5) and data cables through the apertures (1) on the bottom of the box.
2.Put the moving head base (4) on the 4 xative pins (6) in the bottom of the ceiling box (8) and turn the base gently to
the right. Insert and tighten clockwise the 2 quick-lock fasteners (7) to secure the moving head in the ceiling box.