Instruction manual
4.1
Standard operation
4.1.1 Start-up
CD
Check that blank flange of outlet
is
removed.
(g)
Close isolation valve
in
order to prevent the drawback of debris attached to the
inside of vacuum pump into vacuum chamber due to pressure differential,
resulting
in
vacuum break and pollution.
(Open leak valve if you use leak valve).
® Turn
on
vacuum pump.
@)
Check start-up of vacuum pump and open isolation valve (close leak valve soon
after start-up if you use
leak valve) and evacuate vacuum chamber.
Important
When
continuously
operating
pump
at
around
ultimate
pressure
(for
example,
using
as
fore
line
pump
of
turbo
molecular
pump)
,
It
can
cause
for
eig
n
matter
or
moisture
to
deposit
inside
pump,
resulting
in
failure
.
In
that
case,
do
air-flush operation or close isolation
valve
and
open
inlet
to
atmosphere for
3-5
seconds
, 3- 5
times
daily.
Be
careful
not
to
damage
air-flush
port
(especially
air-muffler
section)
.
If
not
,
it
can
cause
failure.
When
doing
air-flush
operation
,
Noise
level
will
increase
(by
7-SdB).
Install
pump
in
an area
which
is
not
exposed
to
debris
such
as
iron
powder,
stone
powder,
polish
powder
or
wood
dust.
Debris
can
clo
air-muffler, undercutt
in
air-fl
ush
effect.
4.1.2 Shut-down
CD
Be
sure to close isolation valve
in
order to prevent the drawback of debris
attached to inside of vacuum pump into vacuum chamber during operation due to
pressure differential (open
leak valve if you use leak valve).
(g)
Turn off vacuum pump.
® Check shut-down of vacuum pump.
Important
Be
sure
to
close
isolation
valve
between
vacuum
pump
and
vacuum
chamber
during
pump
shut-{jown.
If
vacuum
pump
stops
during air-flush operation, atmospheric air
is
dr
aw
n
back
from
air-f
lu
sh
port
to
inside
of
-
21-