Technical data
Preventive Maintenance
Drive System
Voltage and
Current Checks
Step 1
Step 2
Step 3
Step 4
59
• Check security of antenna mounting and interconnecting assembly hardware. Be
certain all electrical grounding connections (including cross-axis grounding straps)
and intact and secure, not corroded or broken. Thoroughly clean any noticeable
corroded portions of grounding cables, unplated portion of universal terminals and
corresponding mounting surfaces with a wire brush. Replace rather than tighten any
loose A-325 structural hardware. The hardware distorts at initial installation and
once loosened will not maintain the required high strength friction connection. All
other assembly and installation hardware should be tightened to its original torqued
condition. When installing new structural hardware, do not use a wrench with a
lever arm longer than two feet.
• Examine painted aluminum and galvanized surfaces and touch-up where required.
At the conclusion of the installation procedure and prior to turning the system over to the
station facility, an installation acceptance check-off sheet was prepared and duly signed off
if installed by an Andrew crew. Part of this check-off included voltage readings retaken to
determine if proper voltage was available. Current readings were also taken as a reference
for future comparison to serve as a troubleshooting aid in determining possible equipment
degradation and shortened life. Any current reading taken during the following procedure
that significantly varies by more than five percent from the preestablished reference values
necessitates trouble shooting the particular system involved to determine the cause and
required corrective action.
Approximately every three months and during a period of down time, disconnect as
applicable the RF transmitter and all power supplies. The main disconnect switch in the
main load center box at the antenna site must be in the ON position and the detachable
hand-held controller assembly must be plugged in.
Open the outer local control/motor drive controller door at the antenna site to gain
access to the conductors supplying power to the azimuth, elevation and polarization
drive motors. Turn the primary power disconnect switch to the ON position.
Turn the Az/El speed switch to the FAST position. Turn the AZIMUTH EAST/WEST
switch to either position and while the antenna is rotating, carefully use a clamp-on
ammeter in accordance with the ammeter manufacturer’s instructions to take current
readings off each of the power conductors (phases) connected to the main terminal
block at the bottom of the panel. Record the current draw in the equipment log and compare
the readings to the reference values entered in the installation/acceptance checkoff.
If the readings differ significantly, refer to the appropriate troubleshooting information
and perform the applicable corrective action. Then take voltage readings off each of the
three conductors; the readings should agree with each other - within two percent. Turn
the AZIMUTH switch to OFF.
Repeat preceding step (3) with the AZIMUTH EAST/WEST switch in the alternate operating
position.