Technical data

Installation Procedures
Step 2
Place plastic sheeting from packing crate as shown in Figure 12. Cut and build center standoff
from the cutting marks on the Andrew crate or use custom 34 in brace (standoff) to support
center of reflector. Cut from the marks on the Andrew crate outer ring wood supports or use
custom 3 in supports for the outer rim of the reflector (3 supports per panel piece). It is
desirable that supports will be leveled to allow faster and easier reflector assembly.
Arrange temporary supports as shown in Figure 12.
• Reflector should be assembled in front of foundation pad with bottom of reflector 3 ft
from pad
Supports should be 3-4 in high
Tie three string levels to opposing blocks across diameter of circle
Figure 46
3 in - 4 in High
Supports
(3 per Panel)
34 in High
Brace (Standoff)
Plastic Sheeting
(From Crate)
String Level
(3 Places)