Technical data

Attach the ground mount assembly to the eight corresponding anchor bolts using a 3/4 inch
flat washer and 2-3/4 inch hex nuts. One 3/4 inch hex nut is supplied with the anchor bolt kit
and the second 3/4 inch hex nut is supplied with the antenna.
NOTE: Ground mount positioning on the foundation is dependent upon predetermined
azimuth viewing requirements. The ground mount assembly arm should be opposite the
satellite requirement. If your site is in the Northern hemisphere, your satellite will be located in
the South. If your site is in the Southern hemisphere, your satellite will be located in the North.
Remove the steel strapping from the ground mount assembly.
Tighten the foundation hardware using the A-325 tensioning procedure.
Figure 18 shows the ground mount assembly attached to the foundation
Installation Procedures
Step 4
Step 5
Step 6
24
Figure 18