Technical data
As stated earlier, Andrew recommends the use of a crane during this installation process;
however, we recognize that a crane may not always be available. If a crane is not available
you can use Andrew Manual Lifting Kit or similar options
The elevation/azimuth low cost manual mount design simplifies installation, minimizes
foundation requirements, and enables horizon-to-horizon coverage from any worldwide
location. The ground mount assembly enables 180 degree positioning for selected azimuth
viewing. Azimuth range coverage is plus or minus 90 degrees, divided into three 120 degree
continuous ranges with a 20 degree overlap. Elevation adjustment is continuous from 0
degrees to 90 degrees.
After ensuring that the foundation has been properly prepared , anchor bolts and pipe
pedestal correctly installed (Andrew PEDMNT-4 or similar 10.75in O.D. schedule 40 pipe
weldment 64.25in min long) - the ground mount assembly process may begin.
The low cost manual mount parts arrive in a packaged wooden crate. The mount can be
positioned manually or by using a crane; however, Andrew recommends that this procedure
be performed using a crane to ensure speed and ease of installation.
Carefully remove the manual mount parts from the packing crate.
Tighten the foundation hardware using the A-325 tensioning procedure. (Pipe pedestal similar
to Andrew PEDMNT-4 should be previously installed or purchased from Andrew Corporation.)
Installation Procedures
Mount Assembly
Unpacking
Step 1
Step 2
14
Figure 3 Figure 4
Figure 5