Technical data
Refer to Foundation Specifications for guidance in preparing the location and the installation
of the 4.0 Meter Earth Station Antenna foundation.
- Unpack ground mount assembly
- Attach ground mount assembly to foundation
- Organize ground mount hardware
- Wax galvanized hardware in hardware kit
- Tighten ground mount hardware to foundation
- Attach azimuth strut weldment to ground mount assembly
- Mount azimuth pivot assembly to ground mount assembly
- Bolt one jack to azimuth pivot assembly
- Unscrew jack
- Tighten galvanized hardware using A-325 hardware procedure
- Lubricate jackscrews
- Pull protective boot over jackscrew
- Bolt elevation pivot assembly brackets to ground mount assembly
- Bolt second jack to elevation pivot assembly
- Unscrew jack
- Tighten galvanized hardware using A-325 tensioning procedure
- Lubricate jackscrews