Specifications

Chapter 2 - Installation
42S315F 2-24
31. Install (Qty 1) grease fitting (item 32) in clevis pivot pin as shown in
sheet 7, view B-B of Drawing 519054. Add grease to grease fitting and
pivot pin.
32. With a level placed directly on the jack screw adjust anchor bolts
until the actuator screw is level with the mount. Tighten 1.0 inch
hardware. Torque anchor pin nuts to a minimum of 240 ft-lb (325
Nm) to maximum of 275 ft-lb (372 Nm).
33. Replace boot and hose clamps.
2.4.7.2 Model 8009AE 120º Mount/Actuator Installation Procedure
NOTE
Procedures in this section are specifically for the Model
8009AE 120° Antenna Mount for Extreme Environment
9-Meter Antenna System. If installing a Model 8009A 9-Meter
Antenna System see instructions given in section 2.4.7.1
beginning on page 2-21. If installing a Model 8009AE 180º
9-Meter Antenna System see instructions given in section
2.4.7.3 beginning on page 2-27.
Drawing 517098 provides the installation drawing for the 9/11-Meter
Antenna 120° mount/actuators. Refer to this drawing for clarification of the
follow procedure. The following steps are recommended for installing the
antenna mount and actuators on the foundation.
1. Ensure the antenna foundation is structurally adequate and provides
suitable anchor bolts as specified in the Site Preparation Manual
42S314 before installing the antenna mount.
2. Refer to sheet 2 of drawing 517098. Locate (Qty 20) 1.25 inch
galvanize washers (item 218) and (Qty 18) 1.25-7 UNC galvanized
nuts (item 219). Install one nut on each anchor bolt at approximately
0.5 inch above the foundation surface. The 0.5 inch clearance will be
required for leveling the mount. Place one washer on top of each nut
in Figure 2-2 on page2-21.
3. Refer to sheet 5 of drawing 517098. Secure a nylon strap to the azimuth
actuator assembly (item 17). Lift the assembly with a crane and position
over foundation anchor bolts. Locate (Qty 6) 1.25 inch galvanized washers
(item 218) and (Qty 6) 1.25-7 UNC nuts (item 219). Loosely install nuts and
washers on anchor bolts and remove the nylon strap.
4. Refer to sheet 2 of drawing 517098. Locate (Qty 8) 1.25 inch galvanized
washers (item 218) and (Qty 8) 1.25-7 UNC (item 219). Secure a nylon strap
to each leg (item 2) at approximately the center. Lift each leg with a crane
and position over foundation anchor bolts. Loosely install four nuts and