Specifications
Chapter 2 - Installation
42S315F 2-6
Table 2-1. Tools and Equipment Required For Installation
Quantity Description
4 Each Straps, nylon, 30 feet long, minimum capacity 5000 pounds each, complete with
lifting ring and attachment hooks
1 Each Hoist, lever-operated cable or chain; 2-ton minimum capacity
2 Each Drift pin, large size for aligning 1-inch holes
2 Each Drift pin, large size for aligning 3/8- and 1/2-inch holes
1 Each Ball peen hammer, 24-ounce
1 Each 10-foot stepladder
1 Each 25-foot extension stepladder
1 Each Torque wrench, 600 ft-lb
1 Each Torque wrench, 6 to 75 ft-lb
2 Each Wrench, spud, 1 5/8-inch size
1 Each Mallet, rawhide
1 Each Rope, 50-foot, 3/8-inch manila or nylon; used for tie line
1 Each Theodolite (wild T2)
1 Set Short focus lens (GV 01 - GV 04)
1 Each Right angle eyepiece
1 Each Battery light kit
1 Each Q-Beam spot light (for reflector adjustment)
1 Each Level (spirit or bubble)
1 Each Level, surface
1 Each Pry-bar
6 Each Clamp, 8-inch, C-type
1 Set Small/medium/large Allen wrenches
1 Each Screwdriver, #2 Phillips
1 Each Plum Bob and string
1 Each Screwdriver, medium, straight slot
1 Each Band cutter
1 Each Gauge, thickness ranges from 0.010 to 0.030 inch
1 Each Angle finder or magnetic base inclinometer
1 Each Grease gun with cartridges
1 Each Crane, approximately 20-tons with a 80-foot boom