Technical information
OM93_Rev H Page 11 of 28
1.3 Foundation Preparation
Before beginning the installation process on the ground mount assembly, ensure that the foundation has been
prepared. Foundation specifications are provided by ASC Signal and may be used as a reference by civil
engineering personnel when preparing the foundation for local soil conditions. These specifications are
available before the shipment arrives by contacting the Customer Service Center or your Account Manager.
Sweep foundation clear of any dirt or debris
To ensure smooth surface for mount, scrape foundation pads as shown in Figure 1-2
Apply stick wax to stud threads to ease later connections
Figure 1-2: Scraping Foundation Pads
1.4 9.3m Assembly & Installation Reference Drawings
This section provides the ASC Signal document numbers of all the necessary instructions, drawings, and
schematics for the assembly of the 9.3m Antenna Reflector. As procedures are performed, be sure to refer to
the appropriate documents, instructions, and/or drawings.
NOTE: Refer to the Introduction, Section I.I, for Top Level Assembly Number if necessary.
Table 1.2: 9.3m Assembly & Installation Drawings/Instructions
Document #
Description
37737C
9.3m Foundation Bulletin
240000
9.3m At-Grade Foundation Layout
240006
9.3m Buried Slab Foundation
240007
9.3m Pier Foundation Layout
37740
Enclosure Door Installation
239954
Mechanical Feed Rotation Drive Installation
37745D
9.3m Ground Mount Assembly Instructions
240858 & 240859
9.3m Hub Enclosure C-Band Interface
237242
9.3m Reflector & Back Structure Installation (includes Subreflector & Strut Instructions)