1.3 Foundation Preparation
Before beginning the installation process on the ground mount assembly, ensure that the foundation has been
prepared. Foundation specifications are provided by ASC Signal and may be used as a reference by civil
engineering personnel when preparing the foundation for local soil conditions. These specifications are
available before the shipment arrives by contacting the Customer Service Center or your Account Manager.
Foundation should be dimensioned as detailed in Mount Assembly Instructions (237151C, see Table 1.2)
Sweep foundation clear of any dirt or debris
To ensure smooth surface for mount, scrape foundation pads as shown in Figure 1-2
Studs should extend 3 in. above the ground and are 7/8 in. in diameter
Apply stick wax to stud threads to ease later connections
Figure 1-2: Scraping Foundation Pads
1.4 7.6m Assembly & Installation Reference Drawings
This section provides the ASC Signal document numbers of all the necessary instructions, drawings, and
schematics for the assembly of the 7.6m Antenna Reflector. As the procedures explained in this manual are
performed, be sure to refer to the appropriate drawing.
NOTE: It is important to match up the appropriate drawings listed in the below table to the antenna’s specific reflector type
(ES76C-1 = C-Band; ES76K-1 = Ku-Band). Refer to the Introduction, Section I.I, for Top Level Assembly Numbers if
necessary.
Table 1.2: 7.6m Assembly & Installation Drawings/Instructions
Description ES76C-1 ES76K-1
7.6m Foundation Specifications
237186A 237186A
7.6m Theodolite Alignment Instructions
N/A 239611A
Reflector & Back Structure Installation
Instructions
239501 239908
Medium Modular Mount Assembly
237151C 237151C
Feed Support Installation Instructions
240159 240159
Feed Rotation Drive Installation Instructions
239954 239954
Subreflector & Strut Installation Instructions
239906 239909
Azimuth Strut Arm Installation
N/A 240179