Technical information

OM56_Rev G Page 10 of 28
1.3 Foundation Preparation
Before beginning the installation process on the ground mount assembly, ensure that the foundation has been
prepared. Foundation specifications are provided by ASC Signal and may be used as a reference by civil
engineering personnel when preparing the foundation for local soil conditions. These specifications are
available before the shipment arrives by contacting the Customer Service Center or your Account Manager.
Foundation should be dimensioned as detailed in Mount Assembly Instructions (??????, see Table 1.2)
Sweep foundation clear of any dirt or debris
To ensure smooth surface for mount, scrape foundation pads as shown in Figure 1-2
Studs should extend 3 in. above the ground and are 7/8 in. in diameter
Apply stick wax to stud threads to ease later connections
Figure 1-2: Scraping Foundation Pads
1.4 5.6m Assembly & Installation Reference Drawings
This section provides the ASC Signal document numbers of all the necessary instructions, drawings, and
schematics for the assembly of the 5.6m Antenna Reflector. As the procedures explained in this manual are
performed, be sure to refer to the appropriate drawing.
NOTE: It is important to match up the appropriate drawings listed in the below table to the antenna’s specific reflector type
(INSERT EXAMPLES HERE). Refer to the Introduction, Section I.I, for Top Level Assembly Numbers if necessary.
Table 1.2: 5.6m Assembly & Installation Drawings/Instructions
Description ES56-1 ES56-2 ES56KK-1
Mount Installation
237151C 237151C 237151C
Pol Locking Kit Installation
37953A 37953A 37953A
5.6m Foundation Specs
237029(5.6m) 237029(5.6m) 237029(5.6m)
Reflector Back Structure Installation
239352 239352 240320
Subreflector & Strut Installation
239438 239438 240329
Hub Enclosure
240849 240849 302772
Motorizable Mount Specs
240865 240865 240865
Enclosure Mounting
240168 240168
5.6m Antenna Installation Drawing
240325 240325 240325
Theodolite Alignment
240337
Subreflector Assembly Drawing
302879