User's Manual
Table Of Contents
- 1. General
- 2. Introduction
- 3. Functional Description
- 4. Commissioning
- 4.1. General
- 4.2. High Power RU Mechanical Installation
- 4.3. Electrical Installation
- 4.3.1. Health and Safety for electrical installation
- 4.3.2. Property Damage Warnings for electrical installation
- 4.3.3. Connections
- 4.3.4. Grounding (Earthing)
- 4.3.5. Connection of the antenna cable
- 4.3.6. Mains power connection
- 4.3.7. Extension Unit port connection
- 4.3.8. External alarm In / Out port
- 4.3.9. RS 485 /+28 V port
- 4.3.10. Local interface port
- 4.3.11. Coupling Probe
- 4.3.12. Optical-fiber cable connection
- 4.3.13. Assembly instructions for optical LC patch cables
- 4.3.14. Optional equipment for optical fiber connection
- 4.4. Commissioning Flow-Chart
- 5. Alarms
- 6. Maintenance
- 7. Appendix
- 8. Index
4. Commissioning
M0200A8C_uc_ION-U_H_7P_80-85P_17P_19P User’s Manual for ION
®
-U Page 29
5. Clean the lip of the inner ring with
lint-free wipe drenched with isopropyl
alcohol.
6. Clean the inside surface of the inner
ring with lint-free wipe drenched with
isopropyl alcohol.
7. Clean the inside of the center
conductor spring tines with a cotton
bud drenched with isopropyl alcohol.
8. Clean in the similar way the
connector of the connected cable.
Remove protective caps from the unit
connector first.