Installation Instruction
Table Of Contents
- 1. General
- 2. Introduction
- 3. Functional Description
- 4. Commissioning
- 4.1. General
- 4.2. High Power EU Mechanical Installation
- 4.3. Electrical Installation
- 4.4. Commissioning Flow-Chart
- 5. Alarms
- 6. Maintenance
- 7. Appendix
- 8. Index
4. Commissioning
M0200A9C_uc_ION-U_EU_H_7P_80-85P_17P_19P User’s Manual for ION
®
-U Page 39
4.4. Commissioning Flow-Chart
Start
Mechanical installation
Fasten wall or pole mounting kit to wall or
pole.
Manual for
Extension Unit
Electrical connections
Connect grounding cable and
ground the EU.
Mains
Switch mains power on.
Philips
screwdriver
Screw driver
Spanner, size
13 mm
Electrical connections
Connect AC (DC) power to the power
cable. Ensure there is a circuit breaker
between mains and RU.
RF connection
Connect antenna cable to antenna port.
RU connection
Mount the RU - EU cable bridge
to the RU and EU.
Mechanical installation
Mount EU to mounting kit, ensure sufficent
air flow and avoid thermal short circuits.
Preparation
Unpack EU, EU accessories and
mounting kit.
Mounting kit
Spanner, size
13 mm
Drilling
machine
Dowels
Screw driver
Grounding cable
Spanner 13 mm
Mains cable
Connecting kit
PE
1
2
3