4. Commissioning
M0200ABA_ION-U_EU_H_23_23 User’s Manual for ION
®
-U Page 19
4.2.4. Wall mounting procedure
Notice: It is the responsibility of the installer to verify that the supporting surface will
safely support the combined load of the electronic equipment and all attached
hardware and components and to ensure that the EU is safely and securely
mounted.
1.
Mark the position of the drilling
holes (for pitches refer to figure
4-2 Wall mounting)
. Drill four
holes at the marked positions and
insert dowels*.
2. Mount the brackets (A) to the wall
using the
M8x80 screws (B), split
lock washers (C), and
washers
(D).
figure 4-2 Wall mounting - pitches
3. Hang the Extension
Unit into the upper
bracket, insert it to the lower bracket,
and
fasten it to the low
er bracket with the
M8x25 screws (E), split lock washers (F),
and washers (G).
* The dowels are not included with the delivery because the suitable type depends on the on-site
conditions (material of wall).