User's Manual

4. Commissioning
Page 18
7.Manual MF0200A0A ION-U_EU H 19P2_uc_08-July-13.docx
User
s Manual for ION
®
U
4.1.2. Wall-Mounting Procedure
Check the suitability of the wall-mounting kit and the wall.
1. Mark the position of the drilling
holes (for measurements refer to
(figure 4-1 Wall Mounting). Drill
four holes at the marked positions
and insert dowels*.
Use a cap nut or lock nut to screw
the four dowel screws into the
dowels and put the distance tubes
over the screws.
Hang the mounting brackets of the
remote unit into the screws, and
fasten them immediately using the
washers and nuts.
Ensure that there is free access to
the electrical connections as well
as to the cabinet. The approved
bending radius of the connected
cables must not be exceeded.
figure 4-1 Wall Mounting
* The dowels are not included with the delivery because the suitable type depends on the on-site
conditions (material of wall). Use dowels or other fasteners that are the most appropriate for the
mounting surface.
It is the responsibility of the installer to verify that the supporting surface will
safely support the combined load of the electronic equipment and all attached
hardware and components and to ensure that the RU/EU is safely and securely
mounted.