Installation Guide

M0201AJG_uc CommScope ERA
®
Medium Power Carrier Access Point Installation Guide
© Decemeber 2020 CommScope, Inc. Page 51
Installing CAP Ms
9 Attach four of the threaded bolts to the side of the top Pole-Mounting Bracket that will face toward the
pole (inside the Pole-Mounting Bracket). Install the M8 nut and washers in the order shown.
a Slide one M8 plain
washer (9A) to one
end of each of the four
threaded bolts.
b Slide an M8 Hexagon
Nut (9B) next to the
M8 plain washer.
c Torque the M8
Hexagon Nut to 27
N-m.
10 Repeat Step 9, but this
time attach four of the
threaded bolts to the
bottom Pole-Mounting
Bracket.
11 One installer should now
hold the Pole-Mounting
Brackets that you
assembled in Step 7
through Step 10 against
in the pole at the position
at which the CAP M is to
be attached to the pole.
The eight threaded bolts
will protrude to the other
side of the pile.
12 The second installer
should now attach one of
the Brackets to the top
four threaded bolts that protrude past the pole. Install the M8 nut and washers in the order shown.
a Slide one M8 plain washer (12A) to one end of each of the four threaded bolts.
b Slide an M8 split-lock washer (12B) next to the M8 plain washer.
c Use an M8 nut (12C) to screw the end of the threaded bolts (with the nut and washer) to the welded
nuts on the inner side of the top Pole-Mounting Bracket.
d Torque the M8 Hexagon Nut to 27 N-m.
13 Repeat Step 12, but this time attach the second Bracket to the bottom four threaded bolts.
14 To mount the CAP M to the pole-mounting kit, follow the steps in "Mount a CAP M Using a Single Mounting
Bracket” on page 35 or "Mount Two CAP Ms Using a Dual Mounting Bracket” on page 41, as appropriate
for this installation.
Bracket
Threaded
bolts
9A
9B
Pole
Mounng
Bracket
12C
Threaded
bolts
12A
12B
4" to 18"
(10.2 cm to 45.8 cm)