Installation Guide

Table Of Contents
M0203A9B_uc CommScope ERA
®
CAP L2 with Fiber Interface
© September 2022 CommScope, Inc. Page 43
Connect the Cables to the Fiber CAP L2
3 Insert the SFP+ module into the port as shown below.
4 Feed the cable from the hybrid splice box through the CAP L2 port, as shown below, and assemble the
OCTIS LC Universal connector and insert it into the CAP L2 port as shown in Figure 3.