Installation Guide
Table Of Contents
- Table of Contents
- Document Overview
- Fiber CAP L2 Overview
- Plan and Prepare for a Fiber CAP L2 Installation
- Mount the Fiber CAP L2
- General Mounting Cautions
- Mounting CAP L2 with a Wall Mounting Kit
- Mounting a CAP L2 with an AC/DC Power Supply Kit
- Wiring the AC/DC Power Supply Kit
- Mounting a CAP L2 with a Hybrid Fiber Splice Box Kit (optional)
- Connect the Cables to the Fiber CAP L2
- Powering on a Fiber CAP L2
- Contacting CommScope
M0203A9B_uc CommScope ERA
®
CAP L2 with Fiber Interface
© September 2022 CommScope, Inc. Page 23
Mount the Fiber CAP L2
7 Lift the CAP L2 onto the bracket and align the holes on the CAP L2 with the rear holes of the bracket,
closest to the mounting surface. Ensure that the hanger tab is secure on the bracket.
8 Tighten the CAP L2 M5 screws, provided with the CAP L2, on both sides on the top and bottom at a Torq
of 6.5 Nm.
9 Confirm that the CAP L2 is securely attached to the Wall Mount Bracket.
M5 screws










