Installation Guide
Table Of Contents
- Table of Contents
- Document Overview
- Fiber CAP L2 Overview
- Plan and Prepare for a Fiber CAP L2 Installation
- Mount the Fiber CAP L2
- General Mounting Cautions
- Mounting CAP L2 with a Wall Mounting Kit
- Mounting a CAP L2 with an AC/DC Power Supply Kit
- Wiring the AC/DC Power Supply Kit
- Mounting a CAP L2 with a Hybrid Fiber Splice Box Kit (optional)
- Connect the Cables to the Fiber CAP L2
- Powering on a Fiber CAP L2
- Contacting CommScope
M0203A9B_uc CommScope ERA
®
CAP L2 with Fiber Interface
© September 2022 CommScope, Inc. Page 17
Plan and Prepare for a Fiber CAP L2 Installation
CAP L2 Dimensions
Use the dimensions shown in the section applicable to this installation to determine the space required at the
mounting site.
Figure 5. CAP L2 Mounting Dimensions
CAP L2 Weights
Use the weights listed in Table 11 to determine a site that can bear the weight of the Fiber CAP L that is being
installed, where:
• The “Maximum Lift Weight” is the highest weight that must be lifted during installation. (An installer only
needs to lift CAP L2 components at one time, not the wholly configured CAP L2.)
• The “Total Hanging Weight” is the weight of the CAP L2, including the weight of the Mounting Bracket and
Power Supply, minus the weight of the external cables and connectors, that the mounting site must be
able to support.