Installation Guide

Table Of Contents
M0201AKD_uc CommScope Era
High Power Carrier Access Point Installation Guide
© December 2019 CommScope, Inc. Page 29
Installing a CAP H
1 Mark the position of where the screw bands should be attached to the pole, as shown in the following
graphic, which also shows the pole-mounting pitches.
Minimum:
775 mm
(30.51”)
Maximum
788 mm
(31”)