User Manual

224
User Manual
each remote unit requires its own power and a connection to the mains can
be needed;
keep into consideration that each remote unit transmits RF signal and
safety volume must be respected (refer to country regulations for safety
volume magnitude);
remote units must be mounted according to what specified in the relevant
installations instructions;
Weight and dimensions of case-L and case-F remote units should be
carefully considered when choosing the installation site and positioning.
During any installation step, please consider the potential risk of any
equipment drop off
When choosing the installation site and position, please consider that any
remote units must be accessible for tests and maintenance.
(1)
Hazardous locations are those areas "where fire or explosion hazards may
exist due to flammable gases or vapours, flammable liquids, combustible dust,
or ignitable fibres or flyings"
6.3. Safety and Precautions
during Installation or maintenance
During installation the following means and tools will be needed:
Typical electrician tools:
cross-point screwdriver, scissors, pliers, nippers, drill and bits, screws for
fixing remote units to the wall.
Typical means:
proper ladder, scaffolding or air platform for installation of remote units.
CAUTION: some modules are electrostatic-sensitive devices;
electrostatic discharges are caused by direct contact or by an
electrostatic field. If a charged body approaches an electrically
conducting surface, the acquired potential is discharged. An
equalising current can than flow in the associated circuitry and
generate permanently damaging voltages by induction.
The human body should be grounded at the same potential as
the component or equipment being handled. A wrist strap creates
an equipotential electrical connection between the object and the
human.
CAUTION: Do not paint or otherwise coat Britecell
Plus
equipment.
CAUTION:
Great caution should always be used when installing any
equipment at a height upper than 2 meters. Personnel who are
installing this equipment should be informed about the possible risks
and safety measures when elevated.