Installation Guide

9
PREPARE
STORM
DOOR FOR
INSTALLATION
(Right Hand)
12
For a Left Hand Installation, go to Page 4.
Q
R
H
1. Install the sill spacer clip (R) under the latch
side sweep screw and tight against the
bottom of the sweep. Tighten the sweep
screw to retain the sill spacer clip in place.
2. Install the latch side spacer clip (Q) over the
latch side of the door frame as shown. This
DMJQTIPVMECFBQQSPYJNBUFMZwGSPNUIF
bottom of the door frame.
TOP
PARTE SUPERIOR
HAUT
a
d
BOTTOM
PARTE INFERIOR
BAS
c
H
I
1. Place the latch side edge of door frame on
the ground. TIP: Lay on door carton.
2. Identify the top of the hinge rail (E).
3. Remove the two middle hex head screws
from the hinge side edge of door frame.
1. Slide sweep n (I) into track in sweep (H). Crimp
both ends of track to secure the n. Trim o
excess sweep n material and properly discard.
2. Install door sweep so it is centered across width
of door frame and pressed tight against bottom
of door frame.
3. $FOUFSQVODIBOEUIFOQSFESJMMwQJMPU
holes at the bottom of the slot for future
adjustment, then attach the sweep using
QBJOUFEwTDSFXTGSPNUIFQJOLCBH
1. Position the hinge rail along the hinge-side
edge of the door frame so the bottom hole
of the 2nd hinge up from the bottom lines
up with the bottom hole from the screws
removed in step 12a. NOTE: The the top of
the hinge rail should extend approximately
wCFZPOEUIFUPQPGUIFEPPSGSBNF
2. 1SFESJMMwEFFQQJMPUIPMFTJOEPPSGSBNFBU
FBDIIJOHFBOEGBTUFOVTJOHwVOQBJOUFE
screws from the pink bag in the installation
kit.
i
VIEW
i
VIEW
i
VIEW
R
E
H
Q
BOTTOM
PARTE INFERIOR
BAS
b
i
VIEW
E
1. Find the Installation Kit (O) located inside the door carton and identify the slot cover (S), the color
NBUDIFEwøBUIFBETDSFXTBOEUIFwESJMMCJUGPVOEJOUIFQJOLCBH
2. Do not remove the insert located inside of the hinge side pocket.
3. Hold the slot cover over the hinge side pocket of the door frame edge. Make sure hinge side
pocket is fully covered by cover plate. Mark the two mounting screw locations.
4. 6TJOHBESJMMBOEwESJMMCJUESJMMBIPMFJOUIFNBSLFEMPDBUJPOT*OTUBMMUIFTMPUDPWFSXJUIUIF
UXPwQBJOUFEøBUIFBETDSFXT
e
i
VIEW
TOP
PARTE SUPERIOR
HAUT
Installation
Kit
O
1/2”
1/8”
x 2
S
1”
x 8
x 2
1/2”
Painted
PINK BAG / BOLSA ROSA / SAC ROSE
Tools needed:
1/8”
O
PROFILE
PERFIL
PROFIL