Instructions / Assembly
Installation
Steps 1 to 3
Steps 4 to 7
Steps 8 to 11
Installation Size Map
A. Move handle into "OFF" position.
B. Turn on water supplies. Check connections for leaks.
C. Remove   and let both hot and cold water run for 
one minute. This will help clean any debris that might 
otherwise clog the system. Replace aerator.
D. Operate handle up and down, in cold and hot positions, 
to flush water lines thoroughly.
aerator
Test Faucet Installation
Simply rinse the surface with clear water or
mild liquid detergents 
if necessary  Dry the
faucet with a clean soft cotton cloth
 Do not
use any cleaning agents containing
acids
 polish abrasives  or harsh cleaners
Maintenance:
2.6” (6.8 cm)
2.8” 
(7.1cm)
Max 1.77” 
(4.5 cm)
0.5” NPT
3.9” (10 cm) 3.9” (10 cm)
Ø 2” (5.2 cm)
Ø 2” (5.2 cm)
6.7” 
(17 cm)
6.1” (15.5 cm)
4.5” 
(11.5 cm)
Ø 1.3” (3.3 cm)
×3 Ø1.3” 
(3.5 cm)
cut-out
ColdHot


