Manual
8
STEP 5 Connect next arch and other hip end
Continue connections as shown previously until entire frame is
connected and sitting on the weldments.
Figure 5a
STEP 4 Connect next arch
Arch
Figure 4
Connect rafters to Ridge weldment, then connect Eave/Ridge purlins.
Continue in like manner at next Arch as required.
Installation Cross Web
Installed on 30’ Frame.










