User Manual
Spanning the world.
BT 2000 240/300 570/627
41
5.5.3 Feed the lower half of the cover and push it fully down.
5.5.4 Hook the cranked hooks into the groove insides of the gable eave rail
(eave purlin).
5.5.5 Mount according the points from 5.5.2 until 5.5.4 the respective 2.
cover
(eye-and loop side).
5.5.6 Cord up both of the covers according the point 5.4.2.
5.5.7 Repeat the points 5.5.2 until 5.5.6 for all the side-and gable walls.
Pic. 28
Fix the
hooks
Hang up the
hooks inside










