User Guide

spanner
rings
plate
5
12-14O pen-end
spanner
15
40 outer piston
rings
25
2nd level pistion
spring
6
screwdriver
16
Outer
dia.16*1.8sealing
ring
26
anti bursting film
7
Needle grease
17
Outer dia
16*1.5sealing
ring
27
Discharge valve
sealing washer
8
S2 hex key spanner
18
6mm inner sealing
sleeve
28
φ7concial spring
9
S2.5 Hex key
spanner
19
Outer dia.10.*1.2
sealing ring
29
Φconcial spring
10
S5 Hex key
20
Outer dia 14*1.5
sealing ring
Machine Parameter:
1Model:GX-4*2E-110 8.Speed of filling air;(0-4500Psi6min/L
2Power supply: 110V 60HZ 9.cooling methodwater cooling+ windy cooling
3
Power:1.2KW 10.Lucubrating method:Oil-free dry lucubrating
4
Max current:13A 11.Operating method:Continuously working for 8
hours
5
Weight:
6
Operating noise:64-72db
Acceptance test.
While purchasing our products, please buy a bottle of around 1L of advanced neutral coolant for your
local cars at the same time. Because its features are suitable for your local climate environments.
1: The connection of the power supply: choose the appropriate power outlet, connect the power
supply to the machine, and toggle the red boat-shaped over-current protection switch, At this moment,
the light of the stop red button will light up and hear the sound of the fan inside the machine. So
switch the boat switch to turn off the power supply immediately after making sure that both items are
normal!
2, Open the cover of coolant water tank on the top of the machine, add coolant to full, wait for 2 - 3
minutes, turn on the boat switch, and water pump starts to work. At this moment, the water flow on
the side of the machine shows that the wheel will turn, and there will be a return water flow out of
the water tank mouth. The water in the tank will be reduced, please continue to add it to level with
the water outlet, and make sure everything is normal and close the water tank cover.
3. Pump up and pressure maintaining test: open the vent valve knob, remove the protective sleeve of