User`s manual

7
Weekday Settings Comments
Minimum Light Level When On (0-100%)
50% Dimmed after midnight
Maximum Light Level When On (0-100%)
100%
Ramp-up Time (0-10 seconds)
3
Motion Control (Yes or No)
Yes Use motion after midnight
Photocontrol (Yes or No)
Yes Dusk-to-dawn
Weekday Settings Comments
Minimum Light Level When On (0-100%)
50% Dimmed after midnight
Maximum Light Level When On (0-100%)
100%
Ramp-up Time (0-10 seconds)
3
Motion Control (Yes or No)
Yes Use motion after midnight
Photocontrol (Yes or No)
Yes Dusk-to-dawn
Prole Name: My Parking Lot
Start Times (Typical)
Morning (6:00am): 12am / Day (8:30am): 6:30am / Evening (5:30pm): 7:30pm / Night (8:30pm): 6:30pm
Days (Check all that apply): Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Quick-start Guide (System Hardware)
STEP 1: Hardware setup of the LumaWatt energy management server, which includes:
a. Attaching an Ethernet cable to the intranet port on the LumaWatt energy management
server from an Ethernet switch on organization’s intranet.
b. Attaching an Ethernet cable to the building port on the LumaWatt energy management
server from router used to access gateways.
NOTE: Consult on-site network administrator before any installation or accessing local intranet.
STEP 2: Initial setup of the LumaWatt energy management server’s conguration, which
includes:
a. Powering on the LumaWatt energy management server.
b. Bringing up a browser window on another computer system to access the internal Web
server running in the LumaWatt energy management server, and logging into the web
server (See FIG. 1-6).
c. Describing the organization.
d. Creating a campus, building, and one or more oors in the building. Note, need oor
plan images for each of the oors.
e. Setting up, if needed, static IP address assignment.
f. Updating the time of use pricing table to match the rate schedule used by the utility
company for the organization.
g. Updating the demand response (DR) pricing table to match the utility rates.
h. Updating all of the proles so that both the day types, and the start time for each
period of the day match what is used by the organization.
Easy Interface
Easy, intuitive, menu driven, interface allows for placement of luminaire icons.
Changing luminaire icons indicated status.
Sensor Prole Sample Worksheet
In order to complete commissioning, the installer
creates proles that dene luminaire behavior.
A prole worksheet can organize the site requirements
as a worksheet to creating sensor proles.
Hardware and Self-diagnostics
The error codes are communicated by observing blinking LEDs. Specic blink patterns are referred on a troubleshooting table for corrective action.
Red LED Green LED Sensor Gateway
Off Off No Power No Power
Off On - Slow Blink Normal (Auto Mode) Normal
Off On - Medium Blink Manual Mode Not Used
Off On - Fast Blink Not Used
Not Attached to LumaWatt
Energy Management Server
Off On - Continuous Not Used Un-commissioned
On - Slow Blink Off CU Communication Failure No IP Address
On - Slow Blink On - Slow Blink Not Used Executing Firmware
On - Fast Blink On - Fast Blink Not Used No MAC Address
On - Fast Blink On - Continuous Not Used Radio Failure
On - Continuous Off Error Error
STEP 3: For each site plan area, doing the following:
a. Install the routers and connect to gateways. Power them on.
b. Install the xtures and power them on. Discover, commission, and place the gateways in the LumaWatt energy management server web GUI. Troubleshooting the
system is easily done by observing sensor and gateway error codes. The error codes are communicated by observing blinking LEDs. Specic blink patterns are
referenced on a troubleshooting table for corrective action.
c. Discover, commission, and place the xtures in the LumaWatt energy management server web GUI. Discovering the sensors then displays a screen icon on the
LumaWatt software ready for assigning a prole and locating on site plans. Verifying the location of site plan icon locations is as easy as ashing light onto a specic
luminaire sensor. The software will highlight the screen icon for that specic luminaire to drag-and-drop to the correct position on the site plan.