User`s manual

4
System Applications
Laying out the LumaWatt system is easy following a few simple guidelines.
Start with the Site Plan
Identify luminaire mounting heights to determine desired sensor lens types, narrow or wide. Specify luminaire
catalog numbers with the lens type sufx; DIMRF-LW for wide lenses used below 16' or DIMRF-LN narrow
lenses above 16' to a maximum of 35'.
Identify which luminaires are within 150' of the building as potential rst points of contact for gateway
communication. Gateways need to be mounted on the interior side of an exterior wall, situated within 150'
of the luminaire chosen as a rst point of contact.
Consider the luminaire layout and identify obstructions or spacing between luminaires approaching or
exceeding 300'. These may warrant an additional gateway nearby for reliable communication. The Ethernet
cable that connects the gateway back to the router is limited to a length of 330'. Locating the gateway as
close as possible to the router will minimize cable installation costs.
In general sensors communicate to any sensor within 250' - 300', line-of-sight, up to a maximum of 300
sensors. To extend the range of the system, any sensor can act as a “hopper” and repeat the signal 300' to
additional sensors. The Gateways are limited to a maximum of 15 “hops” so when laying out the gateways the
best design practice is to locate the gateway within 15 sensors of the farthest sensor.
When powering up the system the LumaWatt energy management server and software go through a
“discovery” process where all sensors start as a hopper. In discovery mode the system creates an optimized
pattern for sensor communication and determines which sensors are to be used as hoppers to extend
coverage or navigate around line-of-site issues. Typically if connection issues occur during commissioning, the
system has developed an incorrect hopper path to the problem xture. This can be manually corrected using
the LumaWatt software during commissioning. FIG. 2
The gateways are connected back to the router via Ethernet cable. Up to of four gateways can be installed
per router. Additional routers can be added up to a maximum of ten gateways per system, operated by a
single LumaWatt energy management server, not to exceed 1,000. FIG. 1
FIG. 2
Gateway
Hopping
Luminaire
300'
Five Hops
Non-Hopping
Luminaire
Obstruction
0
0
20
30
40
8
12 940
Coverage Side Area (Feet)
Coverage Side Area (Feet)
01020304010203040
4912
0
0
10
20
30
40
10
20
30
40
5
10
15
5
10
15
Coverage Top Area (Feet)
Coverage Top Area (Feet)
Occupancy Sensor Detection Patterns
For mounting heights from 8' up to 16'.
For mounting heights from 16' up to 40'.