Corporation NetLinx Integrated Controllers Hardware Reference Guide
Table Of Contents
- NI-700/900 NetLinx Integrated Controllers
- Introduction
- Installation
- Connections and Wiring
- Setting the Configuration DIP Switch (for the Program Port)
- Program Port Connections and Wiring
- Modes and Front Panel LED Blink Patterns
- Port Assignments and Functionality
- AXlink Port and LED
- Wiring Guidelines
- DB9 Device Port: Connections and Wiring
- IRX-RX Port: Connection and Wiring
- Input/Output (I/O) Port: Connections and Wiring
- IR/Serial Port: Connections and Wiring
- Ethernet/RJ-45 Port: Connections and Wiring

Installation
12
NI-700 & NI-900 Hardware Reference Guide
6. Align the ends of the AC-RK with the screw openings along the sides of the equipment rack.
7. Secure the AC-RK to the rack by using the four #10-32 screws (80-0186) and four #10 washers (80-
0342) supplied in the kit.
8. Apply power to the unit to complete the installation process.
To prevent repetition of the installation, test the incoming wiring by connecting the
Controller’s connectors to their terminal locations and applying power. Verify that the
unit is receiving power and functioning properly. Disconnect the terminal end of the
power cable from the connected 12 VDC-compliant power supply.