Widescreen Video Touch Panel Operation/Reference Guide
Installation
23
5" Modero Widescreen Touch Panel
6. Test the incoming wiring by attaching the panel connections to their terminal locations and applying
power. Verify the panel is receiving power and functioning properly to prevent repetition of the
installation.
7. Disconnect the terminal end of the power cable from the connected power supply.
FIG. 19 NXD-CV5 Wall Mount panel dimensions using expansion clips










