User`s manual

28
9. OPERATING PROCEDURE
9.1 IN GENERAL
■ Check that the resistance to be tested isn’t live,
■ Switch ON the instrument by pressing the ON/OFF button (see 3 p.25),
■ Connect the resistance to be measured according to the diagram shown next to the
measurement terminals (see 1 p.25). With the instrument operating according to the
4 wire method, check the correct position of the voltage measurement points. To do
this, apply the voltage measurement instruments (the 10 A clamps supplied with the
instrument can be used both to input the measurement current and to measure the
voltage) at the precise points defining the resistance terminals.
P 2
C 2
U
I
P 1
C 1
▼
The value displayed by
the CA 10 MICROHMMETER
corresponds to the resistance
of the dotted part.