User`s guide
Section 2 – Application Selection and Optimizer Detail Displays
2.4 RMPCT Summary Display
30 Profit Optimizer User's Guide 1/00
Honeywell Inc.
Field Descriptions
Table 2-2 RMPCT Summary –Understanding the Fields and Using the Targets
RMPCT DQP Summary Field Descriptions and User Notes
Field
Description
Field Type Default Access
User Notes
RMPCT
Target OPER
Profit Controller (RMPCT) number
DESCRIPTION
Target ENG
Description of the controller, typically the
name of the process unit or section.
STAT
View Only ENG
Status of the RMPCT
CONNECTION
Target ENG
Connection type
COOP = Cooperative Connection
DIR = Direct Connection
USER = User-Specified Connection
CRITICAL
Target ENG
.Yes / No
OPTIMIZATION
COEF COPY
Target ENG
Copy / Exchange Optimization Coef’s
D => R - Copy from DQP to RMPCT
R => D - Copy from RMPCT to DQP
R <> D - Exchange DQP with RMPCT
D => U - Copy from DQP to
R => U - Copy from RMPCT to
Application
Notes
If any critical RMPCT is turned OFF or WARM, Profit Optimizer (DQP) will be
turned from ON to OFF.