D. Inventory — Inventory all installed and portable equipment for correct quantities.
E. Functional Demonstration — Demonstrate operation of each function of each major piece of
equipment.
F Other Tests - Perform any other tests on any piece of equipment or audio system as requested by
Consultant.
G. Final Equipment Settings — Record final settings of all equalizer bands, tone controls, filters,
delays, limiters, etc., including those established through computer software settings. Include
descriptions of settings (including software settings) in Operation and Maintenance Manual. Include
software copy of configuration file(s) in Operation and Maintenance Manual.
H. Security Inspection — Inspect equipment for security from tampering (covers, shaft-locks, etc.).
I. Review of Labels — Review installed labels on cables, equipment, controls, and terminal strips.
J. Review of Heat Dissipation — Survey temperatures of each piece of equipment after 4 hours use
(minimum). Note any hot equipment.
3.5 SUPPORT DURING OWNER'S FIRST USE OF COMPLETED SYSTEM
Provide personnel familiar with design, installation, and operation of the system to be present at
Owner's first use of the completed system (up to 10 hours in a single session). During first use,
respond to Owner requests for troubleshooting, adjustments, and additional training. If no one
contractor employee or representative can provide expertise in all aspects of the system, provide
multiple personnel for the 4 hours as required. Schedule presence of personnel in advance with
Owner. Should significant elements of the new system be operational prior to final completion,
Owner may elect to schedule contractor presence for conference function prior to final completion
of system. Should Owner exercise this option, contractor presence will not be required at first use
following final completion.