Specifications

2
PART 1 - GENERAL
1.1 DEFINITIONS
A. Section Includes - Complete and working audio visual system for the Level 8 Conference Area and
the Level 8 Classroom/Television Studio in the Cancer Prevention Building at the University of
Texas M D Anderson Cancer Center in Houston, Texas.
1.2 PERFORMANCE REQUIREMENTS
A. High-quality display of video and RGBHV sources.
B. Simple, intuitive control of major system components.
C. Install system in professional manner using balanced audio lines and separation of conductors
carrying different voltage levels to reduce system hum and crosstalk
D. Proper layout of equipment and cables in Equipment Racks, providing flexible operation, ease of
service, and neat appearance.
E. All new equipment to meet or exceed manufacturer's specifications.
F. System to be adjusted for best operation of all components.
G. Related Work Not Included
1. Electrical Work (conduit and electrical power wiring)
2. Millwork
1.3 SUBMITTALS
A. Work Progress Schedule
1. Number of Sets: 4.
2. Guidelines - Estimated progress schedule for Work, in relation to entire Project. Indicate
dates for starting and completing various classifications of construction. Include specific
dates for each submittal requirement, expected completion of conduit by Electrical Contractor
(coordinate), expected completion of electrical power by Electrical Contractor (coordinate),
Initial Tests and Adjustments, Final Tests and Adjustments, and Owner Training. Coordinate
one 12-hour day of quiet time (during first shift) for Final Tests and Adjustments. Schedule
items shall be subdivided such that no single item spans more than 30 calendar days.
3. Timetable — Submit for review within 2 weeks after receipt of contract. Update schedule as
Work progresses.
B. Product Data
1. Number of Sets: 6.
2. Guidelines — According to General Conditions, minimum as follows.
Major Equipment Data — Supply individual data sheet for each major manufactured
equipment item. Include photographs of appearance, descriptions of finishes,
dimensions, and technical data for review by Owner, Architect, and Consultant.
Minor Equipment Data — Multiple-product data sheets for minor items (connectors, hardware,
etc.) are acceptable. Clearly designate items submitted with red arrows or red underlines.
Cross-out items not submitted.
Bind product data sheets together either in GBC or 3-ring type binders.
3. Timetable
Submit total quantity of complete sets of Product Data as required by General Conditions, no
later than 30 days after award of contract. Partial submittals are not acceptable.
Allow minimum of 30 days for review. Two sets will be returned with review comments. If
resubmittal is required, resubmit total quantity of complete sets. If second resubmittal is
required, Contractor shall reimburse Owner for expenses incurred during additional
review process. Obtain approved Product Data before commencement of work.