Instruction manual

Installation and Setup
36
Instruction Manual – Enova DGX 8/16/32 Digital Media Switchers
Caution: We recommend attaching all power cords to a surge protector and/or an AC line
conditioner.
Power-Up Sequence
The following instructions start with attaching only two source and destination devices for the purpose
of executing a test switch (after the factory default switch is disconnected).
To apply power:
1.
Attach the first two source and destination devices.
Do not apply power to the source and destination devices until Step 7.
If connecting devices to DXLink Boards, the boards require DXLink HDMI Transmitters and
Receivers. Install the Transmitters and Receivers between the first two source and/or
destination devices and the DXLink Boards (see “System Setup with DXLink™ Transmitters
and Receivers” on page 82 and the product’s documentation).
If connecting devices to SC Optical Boards, the boards require DGX Fiber Modules. Install
the modules for the first two source and/or destination devices and then connect the modules
to the SC Optical Boards (see “System Setup with DGX Fiber Modules” on page 97 and the
module’s documentation).
2. Optional – Attach an external control device/system (see page 52).
FIG. 20 Power setup for complete redundancy on Enova DGX 32