Instruction manual

Installation and Setup
20
Epica DGX 32 Instruction Manual
3. If applicable – For multiple-enclosure systems, link them according to the instructions provided
(see page 21).
Caution: On systems with SC fiber connectors, we recommend using the provided cable
management bars or some other type of cable management system to avoid damage to the fiber
cables.
4. Recommended for DGX SC Optical Boards – Attach the provided cable management bars to the
input and output boards (see page 21).
5. Attach only the first two source and destination devices (see page 33).
6. If applicable – Systems with DGX SC Optical Input and/or Output Boards require DGX Fiber
modules. Install the modules for the first two source and/or destination devices (see “System Setup
with DGX Modules” on page 47 and the module’s documentation).
7. Attach power cords to both power receptacles on each enclosure, then turn on the entire system
(see page 34).
We recommend using a surge protector and/or an AC line conditioner.
8. Execute a test switch to ensure the system is working properly (see page 38).
9. When the test switch works correctly, attach the remaining source and destination devices and any
additional DGX Fiber modules.
10. If applicable – Use the EDID Programmer.*
* EDID Programmer software can be used for re-programming the DGX DVI Input Boards if necessary
(see page 103). This software is located on the AMX AutoPatch CD (also available at www.amx.com).
Additional Setup
Additional setup tasks may include the following:.
Establishing external control – See page 27.
Establishing an NXB-AP-1000 Server connection (via TCP/IP port) – See page 40.
Setting the control panel password – See page 74 in the “Control Panel Operation” chapter.
Defining local presets – See page 116 in “Appendix B – Managing Configuration Files.”
Defining global presets – See page 63 in the “Control Panel Operation” chapter.