Installation Guide
Radian PEX Panel Installation Guide
Step 2:
After placing the last panel you will want to
start the next row with a staggered pattern so
that you do not have either rows or columns of
panels, this will keep your installation tightly
bound, more durable with less waste. To make
the staggered pattern again starting in the left
corner, you can use any piece that was cut from
the last panel on the first row or cut a new
panel in half. Place the second row panel
ensuring the interlocks are snug and that the
panels are properly aligned.
Step 3:
Continue to place the rows of panels
maintaining a staggered running bond layout. It
may be necessary to cut the panels to
accommodate columns or walls. It may be
necessary to glue the panels in places, use
construction adhesive that is compatible with
foam insulation such as LePage PL300.
Step 4:
Install the PEX tubing by walking it into the
nubs of the panels according to your design
layout; The Amvic Insulated Radiant PEX
panels are specifically designed to properly seat
the tubing to ensure that the concrete is properly
encased around
2