Instructions / Assembly

STEP 14
A. Arrange the pipes, cables & drain hose.
B. Lag the pipe joints with insulating material, securing
it with supplied UV vinyl tape.
C. Run the bundled pipe, cables & drain hose back through
the 2 ½ inch hole.